Medical Buildings

Hospitals, care centers, therapy centers, university hospitals, laboratories, nursing stations, health centers
                       

LKH Graz, Strahlentherapiezentrum LINAC 6 + 7

Eine sensible architektonische Gestaltung der Anbindung an den Bestand aus den 80er Jahren sowie an den Erweiterungsbau LINAC 4+5 aus dem Jahr 2009 ist zu konzipieren.

LKH 2020 Graz - University Clinic for Blood type serology and Transfusion medicine

Due to increasing requirements and hygienic standards a new building got necessary for the blood bank of the Hospital Graz. Ingenos.Gobiet has been charged with the general planning including the project management, construction management and construction-site coordination.

Landesklinikum Neunkirchen

Ziel des Projektes ist es, die hohen Anforderungen an medizintechnischen und haustechnischen Einrichtungen, sowie die funktionalkomplexen Zusammenhänge auf einen menschlichen Maßstab zu projizieren, um den Patienten die Hemmschwelle von einem technischen Funktionalbau zu nehmen.

Gesundheitseinrichtung Josefhof Graz

Der Josefhof ist eine eigene Einrichtung der Versicherungsanstalt für Eisenbahnen und das Kompetenzzentrum für stationäre Gesundheitsförderung und Prävention der VAEB.

Uniklinik St.Pölten

Das neu zu errichtende Haus C und die Gesundheitsstraße wurden gemeinsam mit den Mitarbeiterinnen und Mitarbeitern des Hauses geplant um künftig Patientinnen und Patienten noch besser und zeitgemäßer zu betreuen und zu versorgen. Auf 7 Ebenen mit knapp 60.000m² entstehen u. a. zwei Tiefgeschosse, welche ca. 255 Pkw- Abstellplätze für PatientInnen und BesucherInnen bieten.

Die Inbetriebnahme des Hauses C erfolgt schließlich 2017.

LPZ Bad Radkersburg - Phase 2, 2018

Gegenstand der Bauaufsicht ist die Sanierung und der damit verbundene Umbau des Westtraktes mit Nord- und Mittelteil (=Westrakt) des Landespflegezentrum Bad Radkersburg.

(c) albert wimmer zt gmbh

Hospital North Vienna, 2017

The Hospital North in Vienna is built for 850 beds at the left riverside of the Danube. Due to the construction activities the former 170.000m² industry area gets changed into a high-developed health area.

State hospital Styria Leoben radiotherapy Linac 1, 2017

New building of a radiotherapycentre with linear accelerator, planning-CT and examination and treatment rooms in addition to the existing clinic of the state hospital Leoben.

General Hospital Vienna New Buildings, 2014

The completion of the General Hospital Vienna took over 135 finishing and new projects. Two old buildings got renovated and two building complexes were newly built.

Hospital Rudolf Foundation Juchgasse 22, 2014

The City of Vienna - Association of Vienna's hospitals is building a new oject with the functional areas psychiatry, psychosomatic medicine, clinical psychology and pain clinic. The object will be implemented in low energy design.

Sanatorium Hera New, 2014

With the project "Sanatorium Hera New" a total reconstruction of the whole building complex is going to be implemented. The reconstructions objective is to optimise organisational structures and processes.

LKH Weiz New Building incl. Annex Intensive Care

New Building of a Hospital for internal medicine (32 beds) and surgical care (40 beds, 2 OPs) and one further building for intensive care (4 beds).

Caritas Nursing Home Pfaffing, 2012

The project Nursing Home Pfaffing comprises the enlargement of the existing building and a new building of the Nursing Home following low energy standards (HWB < 50 kWh/m²a).

Rehab Clinik Kittsee, 2012

A new rehabilitation centre with 77 patient beds and 25 hotel beds has been constructed in Kittsee. Ingenos.Gobiet was responsible for the general planning, structural framework planning, building physics and the construction-site coordination.

LKH Graz - Radiation Therapy Linac 4+5, 2010

Due to increasing requirements two new linear accelerators became necessary for the Hospital Graz. Within the acquisition of the linear accelerators the enlargement of the existing radiation therapy center in Graz became necessary as well. Therefore an annex of about 10.000m² gross floor area following the necessary technical standards got constructed.

 
Pages: 1 | 2